CurrentMandatoryUpcoming replacement

GB19197-2003

Criteria of karting circuit construction

卡丁车场建设规范

GB 19197-2003 is a current mandatory Chinese national standard for Criteria of karting circuit construction. It appears in the Construction compliance cluster with a product safety focus and has an implementation date of Dec 1, 2003.

Applicability depends on product scope, certification route, competent authority notices and transition rules. Requst for the translation or verify source before using this record in a compliance decision.

Compliance overview

Scope and applicability

This standard applies to the design, appraisal inspection, and registration inspection of karting circuits. It covers three specific categories: outdoor competition, outdoor recreational, and indoor karting circuits. It is mandatory for all entities involved in the construction and operation of karting facilities in China. The standard references GB 19196 for kart classification and registration.

Technical requirements

The standard specifies the physical dimensions and layout of the track, including length, width of straight sections, and curve widths. It also regulates the maximum length of straight sections and the geometric design of curves based on vehicle speed and trajectory. Designers must ensure that track dimensions and curve radii comply with the specified safety parameters. Requirements for the track surface material, compaction, flatness, and anti-skid performance are defined. The standard also mandates specific longitudinal and cross slopes for both outdoor and indoor tracks. Additionally, it outlines the necessity of auxiliary roads, work areas, and public facilities such as medical centers and signage. A significant portion of the standard details the safety zones, buffer zones, and protective barriers required around the track. This includes specifications for safety nets, tire walls, and sponge barriers to protect drivers, spectators, and buildings. Strict compliance with these protective measures is essential to prevent accidents and ensure operational safety. For indoor karting circuits, the standard imposes special requirements regarding ceiling height, ventilation, lighting, and crash protection around building pillars and glass walls. It also requires designated parking and preparation areas with deceleration lanes connecting to the main track.

Testing methods

The standard outlines two main types of quality inspections: appraisal inspection and registration inspection. Appraisal inspection evaluates overall compliance with the standard and is the basis for market access, while registration inspection determines eligibility for hosting specific levels of karting events. Inspections must be conducted by authorized institutions, and the appraisal inspection report is valid for a limited period.

FAQs

What types of karting circuits are regulated under GB 19197-2003?

The standard regulates three types: outdoor competition karting circuits, outdoor recreational karting circuits, and indoor karting circuits.

Is GB 19197-2003 a mandatory standard?

Yes, all technical content in this standard is mandatory for the design, construction, and inspection of karting circuits in China.

How long is the appraisal inspection report valid?

The appraisal inspection report for a karting circuit is valid for 3 years. Upon expiration, the facility must stop using the track and reapply for inspection to continue operations.

The summary above provides a high-level overview of GB 19197-2003. To ensure complete compliance for your karting circuit projects entering the Chinese market, a precise and professional translation of the full technical specifications is essential. Purchase our high-quality English translation of GB 19197-2003 today to access all detailed parameters, tables, and testing procedures.

Applicability hints

Type
Foundational
CCS
Y55
ICS
97.220.10
Competent department
General Administration of Sport of China
Technical committee
General Administration of Sport of China

Relationships

Replaced by:GB 19079.2-2026 (Upcoming)